PoolFIX bevestiging boven een zwembad
Scenario comparison

Compare costs using your own assumptions.

Unit price is one part of a cost scenario. Enter the calculation period, assumed replacement moments, labour and excluded costs before comparing options.

Adjustable worked example · no promised service life

From unit price to project cost

Compare the same cost basis

The example values below are input assumptions. Actual costs and replacement moments may differ, and the calculation can also show no benefit or higher PoolFIX costs.

Purchase scenario

Standard€200
PoolFIX€450

Example: 1,000 points, excluding initial installation

Entered service life

Standard2 years
PoolFIX14 years

User assumptions, not a product guarantee

Replacement labour

Standard€18,000
PoolFIX€0

Example based on 3 minutes per point and €60/hour

Example period: 14 years

Replacement moments follow only from the entered service life

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Replacement based on input: 2 · 4 · 6 · 8 · 10 · 12
No replacement within the example period: 0 → 14

Cost structure

The unit price is not the cost driver

Standard materials€1,400
Standard labour€18,000
PoolFIX total€450

Full comparison

Cost itemStandardPoolFIX
Purchase cycles71
Replacement rounds60
Material costs€1,400€450
Replacement labour€18,000€0
Total scenario costs€19,400€450

Interactive TCO calculator

Enter your project assumptions.

Adjust the inputs to your situation. Results update live.

Scenario comparison

Standard scenario total€19,400
PoolFIX scenario total€450
Lower PoolFIX scenario cost€18,950
Standard / PoolFIX cost ratio43.1 ×

This result follows from your assumptions. Actual costs, technical suitability and replacement timing may differ.

The calculation includes the initial purchase and replacements only at t = k × entered service life where 0 < t < calculation period. Replacement materials and entered labour are included. Initial installation, access equipment, inspection, downtime, disposal and residual value are excluded.

More than a calculation

Four points for a comparable scenario

Visible replacement moments

See which replacement rounds follow from the values you entered.

Transparent assumptions

Record period, cost items and assumed replacement timing before comparing scenarios.

Available documentation

Review product and delivery documents where available for the selected item.

Application assessment

Assess position, load, environment and maintenance strategy separately from the cost scenario.

Frequently asked questions about the cost scenario

The example treats initial installation as equal for both options. If that is not true for your project, include the difference separately.

Review the assumptions before deciding.

Discuss technical suitability, excluded cost items and available product documentation for your project.