Stappegoor swimming pool with EVA Optic lighting

Practical case · collaboration since 2023

EVA Optic lighting, secured with PoolFIX

Since early 2023, EVA Optic has equipped its lighting systems with PoolFIX fasteners. This brings fastening in as a separate technical element in pool projects.

Stappegoor · Tilburg · Image: EVA Optic

Collaboration

Formalized in early 2023

PoolFIX contribution

Nuts, bolts and screws

Selection basis

Project, location and load

Two specialisms, one project route

Fastening is part of the lighting system

EVA Optic develops lighting for pool environments. PoolFIX focuses on fasteners and the associated material and documentation choices. In the collaboration, these elements are brought together earlier.

That makes fastening visible in the technical preparation: which item is used, where it is installed, which exposure and load are relevant, and which product documentation belongs with the supply?

The original EVA Optic publication mentions PoolFIX 5th generation and 1.4529. In the current PoolFIX route, PoolFIX Coated is first assessed where there is an approved product-specific rule for it. 1.4529 remains a limited exception that requires a project-specific technical assessment.

What PoolFIX adds

From loose fastener to documented choice

The collaboration is not about one universal material, but about a verifiable route to a suitable fastening.

Application-oriented selection

Location, exposure, substrate, load and installation are taken into account in the material choice.

Item-linked documentation

Available product and batch documentation is linked to the actual delivered item.

Clear escalation

If no approved rule or project information is available, technical material advice follows rather than automatic approval.

Project images from EVA Optic

Lighting in recognizable Dutch swimming pools

The original EVA Optic publication shows projects in Tilburg, Kampen, Eindhoven and Amsterdam. The images below are stored locally; the image source remains EVA Optic.

De Steur swimming pool with EVA Optic lighting
De Steur · KampenImage: EVA Optic
Ottenbad with EVA Optic lighting
Ottenbad · EindhovenImage: EVA Optic
Noorderparkbad with EVA Optic lighting
Noorderparkbad · AmsterdamImage: EVA Optic

How we work together

Four steps from project request to delivery

The fastening choice is not added afterwards, but handled as a verifiable part of project preparation.

  1. 1

    Record project data

    Lighting system, fastening location, substrate, exposure and load are defined concretely.

  2. 2

    Assess the material route

    PoolFIX checks the available information against current, approved product-specific application rules.

  3. 3

    Select item and documentation

    The chosen fastening is linked to the available technical product and delivery documentation.

  4. 4

    Deliver and keep traceability

    The project party receives the agreed items with the available item and batch information.

Clear division of roles

Specialist collaboration without a general product promise

EVA Optic remains the specialist in the lighting solution. PoolFIX supports the selection and supply of fasteners. Design, structural verification, installation, inspection and maintenance remain responsibilities within the relevant project.

This case describes the collaboration route. It is not a project-specific approval, structural calculation, declaration of conformity or replacement for current product documentation.

Discuss your application

Include fastening early in the project too?

Share the location, load, substrate and exposure. PoolFIX helps map the available material route and documentation for your project.

Cookie Policy

This website uses cookies to improve your experience and ensure proper functionality.