Purchase
A one-off €250 difference

A low unit price tells only a small part of the story. Replacement, preparation, access and labour determine the true lifecycle cost.
Worked example: 1,000 fastening points · 14 years
From unit price to project cost
The initial premium quickly disappears when a standard fastener needs repeated replacement. This comparison makes both materials and labour visible.
A one-off €250 difference
Across a 14-year period
At 3 minutes per fastening point
14 years at a glance
Cost structure
| Cost item | Standard | PoolFIX |
|---|---|---|
| Purchase cycles | 7 | 1 |
| Replacement rounds | 6 | 0 |
| Material costs | €1,400 | €450 |
| Replacement labour | €18,000 | €0 |
| Total lifecycle costs | €19,400 | €450 |
Interactive TCO calculator
Adjust the assumptions to your situation. Results update live.
The calculation includes material for every purchase cycle and labour for every replacement round. Initial installation labour is equal for both options and excluded.
More than a calculation
Reduce downtime, closures, access equipment and repeated work preparation.
Make the full service life visible before price and material enter the specification.
Support material selection and management with PoolFIX documentation where applicable.
Select on position, load, environment and maintenance strategy — not unit price alone.
The first installation is required for both options. Only labour created again by replacement determines the difference.
Ask PoolFIX to review material selection and lifecycle costs for your pool project.